Showing posts with label knock through. Show all posts
Showing posts with label knock through. Show all posts

Friday, 26 July 2013

Knocking through the internal walls

Now the roof is up and water tight, the next stage of the build project is to knock through.This video shows how the builders get through the internal wall between the kitchen and dining room.



This part of the house extension project was not as messy as I expected and the builders did a superb job of minimising the amount of brick dust around the house.


Internal Walls knocked through

The builders carefully removed the rear wall of the property and the steel beams now support the rear of the property.

Rear of property knocked through

This photo shows the rear of the property from the inside. The old exterior wall is knocked through and the room now is opened up into the extended area.



Thursday, 25 July 2013

House Extension Roof is Built

The house extension roof frame is in built. The extension is starting to come together now with significant changes happening at a faster rate.

Once the roof is up and water tight over the extension, knocking through the existing walls can be done.(exterior and between the kitchen and dining room).

Roof frame built

The three areas mark out where the skylights are going to be located.

Roof is constructed and tiles await fitting