Over the last two days, the up-sized excavator dug two very deep 2.4 metre trenches to be filled to form two large concrete pads, on which the foundations can continue to be built.
The photos below show the digging of the 2.4 metre deep foundation trenches and the trenches partially filled with concrete.
The weather has been fair for Wednesday and Thursday this week already allowing good progress with Friday to go.